First we call and discuss your bathroom renovation with you. i.e. Your bathroom design, tiles, shower enclosures, toilet and sink units, etc. We get a plan of what your bathroom will look like, we calculate the cost and if we agree, we set a start date.
Day 1, plumbers and tilers begin to remove all old fittings and load them in a skip. The plumbers then move all new pipe work into position.
Day 2, we will remove all old tiles, and the electrician puts in any new wiring needed. e.g. If you require a new shower (normally, we use Mira or Triton showers) or if new bathroom lighting is required.
Day 3, the tiling is started. This normally takes one and half days.
Day 4 -5, the bathroom is cleaned down. And all your fittings i.e. Shower enclosures, sink units, toilet, bathroom accessories are fitted.
Your bathroom renovation is completed and skip will be collected.